首页 | 本学科首页   官方微博 | 高级检索  
     


Estimating job waiting times in production systems with cross-trained setup crews
Authors:Ufuk Kula   Izak Duenyas  Seyed M. R. Iravani
Affiliation: a 1Department of Industrial and Operations Engineering, University of Michigan, Ann Arborxys, MI, USAb 2University of Michigan Business School, Ann Arbor, USAc 3Department of Industrial Engineering and Management Sciences, Northwestern University, Evanston, IL, USA
Abstract:We model a production system with multiple machines, each serving a variety of jobs. The machines require setups to switch from one job to another. Setup operations are performed by a limited number of setup crews who are cross-trained to perform all setup operations. We develop an approximation model that takes into account the effect of delays caused by unavailability of the setup crews, and obtain average job waiting times in the system. A numerical study demonstrates that our approximation performs very well. Our study also provides insights into the importance of explicitly modeling the effects of cross-trained setup crews on performance measures, and whether and when the cross-training of setup crews improves system performance.
Keywords:
本文献已被 InformaWorld 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号