首页 | 本学科首页   官方微博 | 高级检索  
     


Cost Performance Comparison of Two Public Sector Project Procurement Techniques
Authors:John A Kuprenas  Elhami B Nasr
Affiliation:1Vice President, Vanir Construction Management, Research Assistant Professor, Dept. of Civil Engineering, Univ. of Southern California, 3435 Wilshire Blvd., Suite 2050, Los Angeles, CA 90010-2006. E-mail: kuprenas@usc.edu
2Professor, Dept. of Civil Engineering and Construction Engineering Management, California State Univ., Long Beach, Long Beach, CA 90840. E-mail: enasr@csulb.edu
Abstract:Increased industry discussion of the potential benefits of alternative forms of construction project delivery often presents little cost analysis of options. This work presents the results of a cost comparison study of completed public sector municipal facilities design and construction projects—a portion of which delivered using a traditional design-bid-build procurement approach and a portion of which delivered using the procurement technique of a negotiated lump sum construction contracts with in-house construction forces. The study compares costs for all phases of all the projects (design, bid and award, construction, and total project cost) across both methods of project procurement. Conclusions examine the cost trade-offs of using negotiated contracts with in-house forces, outline key success factors identified through this study in order to optimize the use of this form of project procurement, and identify areas for future research.
Keywords:Cost analysis  Life cycle costs  Procurement  Delivery  Project management  Public works  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号