干煤棚工程扣件式脚手架计算
作者单位:陕西省机械施工公司,陕西省机械施工公司南京分公司,山西汾阳市建筑金属结构有限公司
摘    要:江苏镇江电厂2×600MW机组干煤棚钢网壳工程,网架施工前搭设扣件式钢管脚手架。结合工程实际,选用参照规范,计算了钢管脚手架的最大搭设高度、稳定性以及立杆底座和地基承载力,并对其进行验算,扣件连接抗滑移和荷载偏心等均满足安全要求。

关 键 词:钢管  扣件式脚手架  计算  验算

Calculation of Fastener Scaffold for Coal Storage Project
Zhang Yongping,Yan Airong,Zhang Chao,Shi Xiangbin. Calculation of Fastener Scaffold for Coal Storage Project[J]. Construction Technology, 2008, 0(Z2)
Authors:Zhang Yongping  Yan Airong  Zhang Chao  Shi Xiangbin
Affiliation:Zhang Yongping~1,Yan Airong~2,Zhang Chao~2,Shi Xiangbin~3
Abstract:Fastener scaffold should be erected before grid construction of steel reticulated steel.Combining with the practical project and guides,the biggest erected height,stability,bearing capacity of upright strut stanchion base and foundation for scaffold are calculated.Through checking,the results of fastener connection anti-sliding and load eccentricity can meet the security requirement.
Keywords:steel pipe  fastener scaffold  calculation  checking  