索风营水电站坝线坝型选择
引用本文:龙起煌. 索风营水电站坝线坝型选择[J]. 贵州水力发电, 2002, 16(2): 36-39
作者姓名:龙起煌
作者单位:国家电力公司贵阳勘测设计研究院,贵州,贵阳,550002
摘    要:索风营水电站坝址、坝线选择的影响因素很多 ,其中最主要的是坝址的工程地质条件、物理地质现象和防渗帷幕等 ;而泄水建筑物的布置和施工进度 ,又是影响坝型选择的主要因素。经过对坝址区工程及水文地质的不断深入勘测和设计比较 ,最终选择中坝址中坝线 ,坝型为碾压混凝土重力坝。文章就该工程的坝址、坝线及坝型选择作简要介绍

关 键 词:索风营水电站  坝址  坝线  坝型
文章编号:1007-0133(2002)02-0036-04
修稿时间:2002-03-10

Selection of Dam Type & Axis of Suofengying Hydropower Station
LONG Qi-huang. Selection of Dam Type & Axis of Suofengying Hydropower Station[J]. Guizhou Water Power, 2002, 16(2): 36-39
Authors:LONG Qi-huang
Abstract:There are many factors that influence the selection of dam site and axis of Soufengying Hydropower Station. Among them more important ones are engineering geological condition, physical geological, phenomenon, anti-seepage curtain and etc. The layout of discharge structure and construction schedule are main factors that influence the selection of dam type. Deeply investigated hydraulic and engineering geology and compared design, the final selection is middle axis of the dam site and rolled compaction concrete (RCC) gravity dam.
Keywords:Soufengying Hydropower Station   dam site   dam axis   dam type