北江引水隧洞TBM法施工经济分析
引用本文:丁辉.北江引水隧洞TBM法施工经济分析[J].广东水利水电,2016(1):59-61.
作者姓名:丁辉
作者单位:广东省水利电力勘测设计研究院,广东广州,510635
摘    要:对全断面隧道掘进机(简称TBM)在广州北江引水隧洞中造价进行经济分析,说明造价中占主要因素的部分为TBM设备与皮带机设备费,降低设备费或增加摊销次数成为降低投资的关键,为以后更好的运用TBM设备和编制施工造价,提供重要参考依据.

关 键 词:TBM设备  指标  技术  经济分析
收稿时间:2016/1/4 0:00:00
修稿时间:2016/1/4 0:00:00

Economic analysis of TBM method in Beijiang diversion tunnel project
DING Hui.Economic analysis of TBM method in Beijiang diversion tunnel project[J].Guangdong Water Resources and Hydropower,2016(1):59-61.
Authors:DING Hui
Affiliation:Guangdong Hydropower Planning & Design Institute, Guangzhou 510635,China
Abstract:Economic analysis has been carried out for full face tunnel boring machine (referred to as TBM) in Guangzhou Beijiang diversion tunnel project,the main factors of the costs are the TBM equipment and belt conveyor equipment,reducing equipment costs or increasing the number of amortization is the key factor of reducing investment.Important reference is provided for using TBM equipment and making construction cost in this paper.
Keywords:TBM equipment  index  technique  economic analysis