浅谈阳江抽水蓄能工程弃渣场场址选择
引用本文:刘翔宇. 浅谈阳江抽水蓄能工程弃渣场场址选择[J]. 广东水利水电, 2016, 0(3): 56-58. DOI: 10.3969/j.issn.1008-0112.2016.03.017
作者姓名:刘翔宇
作者单位:广东省水利电力勘测设计研究院,广东 广州,510635
摘    要:通过阳江抽水蓄能电站工程项目区地形地貌、气象、水文、土壤植被、水土流失现状的分析,对原主体工程渣场方案进行了调整,优化方案在弃渣运距、周围敏感点、水保措施等方面均得到了较好的改善。

关 键 词:弃渣场  选址  堆置方式
收稿时间:2016-03-09
修稿时间:2016-03-09

On Yangjiang Pumped Storage Spoil Yard Site Selection
LIU Xiangyu. On Yangjiang Pumped Storage Spoil Yard Site Selection[J]. Guangdong Water Resources and Hydropower, 2016, 0(3): 56-58. DOI: 10.3969/j.issn.1008-0112.2016.03.017
Authors:LIU Xiangyu
Affiliation:Guangdong Hydropower Planning & Design Institute, Guangzhou 510635
Abstract:By Yangjiang Pumped Storage Power Station Project area topography, meteorology, hydrology, soil and vegetation analy-sis, soil erosion status quo, the original spoil field program of the main project has been adjusted to optimize the program spoil haul around sensitive points, soil and water conservation measures have been well improved.
Keywords:spoil yard  location  stacking mode
本文献已被 万方数据 等数据库收录!
点击此处可从《广东水利水电》浏览原始摘要信息
点击此处可从《广东水利水电》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号