自升式风电安装平台半浮态作业安全性评估
引用本文:朱俊峰,周锋,李飞,施兴华.自升式风电安装平台半浮态作业安全性评估[J].中国海洋平台,2022(1):19-23.
作者姓名:朱俊峰  周锋  李飞  施兴华
作者单位:江苏亨通蓝德海洋工程有限公司;江苏科技大学船舶与海洋工程学院
基金项目:国家自然科学基金(编号:51509113,51809126);江苏省自然科学基金(编号:BK20181468);江苏省高校自然科学基金(编号:16KJA580003)。
摘    要:为解决目前在规划风场海域作业的自升式海上风电安装平台不能满足现有的海上风机设备安装的问题,提出一种自升式风电安装平台半浮态作业方案.采用Sesam的Wadam模块进行波浪载荷预报,计算得到不同吃水下的波浪载荷.分析风力方向为90°(横风)时,不同吃水下的风电安装平台的风载荷和流载荷.在此基础上,建立整船有限元模型,采用...

关 键 词:海上风电安装平台  半浮态作业  风流载荷  安全性校核

Safety Assessment of Semi-Floating Operation of Jack-up Wind Power Installation Platform
ZHU Junfeng,ZHOU Feng,LI Fei,SHI Xinghua.Safety Assessment of Semi-Floating Operation of Jack-up Wind Power Installation Platform[J].China offshore Platform,2022(1):19-23.
Authors:ZHU Junfeng  ZHOU Feng  LI Fei  SHI Xinghua
Affiliation:(Jiangsu Hengtong Lande Ocean Engineering Co.,Ltd.,Nantong 226000,China;School of Naval Architecture and Ocean Engineering,Jiangsu University of Science and Technology,Zhenjiang 212003,China)
Abstract:In order to solve the problem that the jack-up wind power installation platform can not meet the existing installation problem of offshore wind turbine equipment, a semi-floating operation scheme of jack-up wind power installation platform is provided. The Wadam module of Sesam software is used to predict the wave load and the wave load at different drafts is calculated. The wind and flow loads at different drafts are analyzed when the direction of wind is 90°. The finite element model of the whole ship is established and the support reaction of the leg is calculated by the analysis module Wajac provided by Genie. The anti-capsizing moment and safety factor of the platform at different drafts are obtained, and the draft range of the waves which may have greater impact on the bottom of the ship is analyzed. The results show that: the semi-floating state can provide greater buoyancy when the draft is in the range of 0.5-3.0 m;the pressure of the leg bottom changes gently when the draft is about 1.5 m. Therefore, the operation efficiency can be improved and the time of moving ship is reduced by the semi-floating state for installation compared with large insertion depth and full lift operation, which can provide reference for practical engineering.
Keywords:offshore wind power installation platform  semi-floating operation  wind and current load  safety assessment