连续箱梁挂篮施工监理要点初探
引用本文:梁文军.连续箱梁挂篮施工监理要点初探[J].山西建筑,2010,36(7):214-215.
作者姓名:梁文军
作者单位:太原市城市建设管理中心,山西,太原,030009
摘    要:通过连续箱梁挂篮施工监理全过程论述,分析了连续箱梁挂篮施工监理中的要点及难点,并结合实践叙述了连续箱梁挂篮施工控制要点,供同行参考。

关 键 词:连续箱梁  挂篮施工  监理  控制要点

The primary research on engineering supervision of hanging basket of continuous box girders
LIANG Wen-jun.The primary research on engineering supervision of hanging basket of continuous box girders[J].Shanxi Architecture,2010,36(7):214-215.
Authors:LIANG Wen-jun
Affiliation:LIANG Wen-jun
Abstract:Through the discussion on the whole course of construction and supervision of hanging baskets of continuous box girders,this paper analyses the key points and difficulties in its course and combine practice elaborates on the key points of its construction controlling for the reference of counterparts.
Keywords:continuous box girders  hanging basket construction  supervision  key point controlling  