首页 | 本学科首页   官方微博 | 高级检索  
     

五一水库联合进水口高边坡抗滑稳定分析
引用本文:文军,龚建新,廖建忠.五一水库联合进水口高边坡抗滑稳定分析[J].地下空间与工程学报,2013,9(2):420-426.
作者姓名:文军  龚建新  廖建忠
作者单位:1.新疆水利水电勘测设计研究院,乌鲁木齐 830091;2.新疆乌鲁木齐水文水资源勘测局, 乌鲁木齐 830000
摘    要:为调查分析五一水库联合进水口边坡的整体稳定性与局部稳定性,首先根据进水口边坡的地形地貌特征、地层岩性等,对进水口边坡的稳定性进行定性分析评价,并确定其可能的失稳模式,其次根据进水口边坡岩体产状与边坡产状的关系以及可能的失稳模式等特点,将进水口边坡分为正面坡、左侧坡、右侧坡三个子区。并在三个子区选取具代表性的剖面,采用二维极限平衡方法,对进水口边坡各工况条件下不同滑移模式的稳定状况进行定量分析计算。计算结果显示:除进水口正面坡在施工期整体滑动(由坡顶至坡脚剪出)滑移模式的安全系数较小、有发生浅层滑动失稳的可能外,其它各边坡计算剖面各工况下的安全系数均满足规范要求。由于边坡在水库蓄水后大部分位于库水位以下,在水的作用下岩土体软化,其局部部位存在发生浅层滑塌失稳可能,建议加强施工、蓄水和运行期间边坡的变形观测,并采取相应的支护措施。

关 键 词:联合进水口  二维极限平衡方法  边坡稳定性  
收稿时间:2012-11-13

Anti-slide Stability Analysis of High Bank at the Joint Intake of Wuyi Reservoir
Wen Jun,Gong Jianxin,Liao Jianzhong.Anti-slide Stability Analysis of High Bank at the Joint Intake of Wuyi Reservoir[J].Chinese Journal of Underground Space and Engineering,2013,9(2):420-426.
Authors:Wen Jun  Gong Jianxin  Liao Jianzhong
Affiliation:1.Xinjiang Water Conservancy and Hydropower Investigation and Design Institute,Urumqi 830091,China;2.Xingjiang Urumqi Hydrology and Water Resources Bureau,Urumqi 830000,China
Abstract:In order to investigate and analyze the partial and whole stability of the bank at the joint intake of Wuyi reservoir, at first, an evaluation and qualitative analysis of slope stability was carried out according to the topography features and formation lithology of the slope, to determine its possible instability mode. Then according to the relation between occurance of the rock mass and the slope after excavation at the joint intake, and the possible unstable mode, to divide the slope at the joint intake into three regions: the positive slope, the left slope, and the right slope. By selecting representative section and using 2D limit-equilibrium method, a quantitative analysis and calculation was carried out on slope stability with different sliding patterns under different working conditions. The result of calculation is: only for the positive slope, the factor of safety to the whole slip mode (cut out from the top to the toe of a slope) during construction period is smaller, and the shallow sliding is possible. The factors of safety of all other slopes meet the requirements of specifications even in different working conditions. Because most of the slope is below the water level when the reservoir is filled, the rock will be softened under the water, the shallow slide may occur somewhere. It is suggested to observe deformation of the slope during construction after impoundment and running period, and take corresponding supporting measures.
Keywords:joint intake  2D limit-equilibrium method  slope stability  
本文献已被 万方数据 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号