首页 | 本学科首页   官方微博 | 高级检索  
     

多目标模糊模型优选水电站装机容量
引用本文:陈宁珍.多目标模糊模型优选水电站装机容量[J].水利水运工程学报,1996,0(3).
作者姓名:陈宁珍
作者单位:河海大学
摘    要:本文提出综合考虑经济、社会及环境效益等多种目标优选水电站装机容量。应用模糊数学原理,建立优选水电站装机容量的多目标模糊模型。通过某电力系统增容,同时考虑水、火电站装机优化选择的实例,说明多目标模糊模型的有效性。

关 键 词:多目标,模型模型,水电站,装机容量

Applied multi-objective fuzzy model for installed capacity of hydroelectric station
Chen Ningzheng.Applied multi-objective fuzzy model for installed capacity of hydroelectric station[J].Hydro-Science and Engineering,1996,0(3).
Authors:Chen Ningzheng
Abstract:This paper deals with the synthetical consideration of multiple objective of economy,social practice and environment etc.. efficient for the optimal selection of installed capacity Of hydropower station. Aceording to the fuzzy theory multiple objective fuzzy model is aet up. An example for increasing installed capacity of hydroelectric station and steam power plant is given and shows its effectiveness.
Keywords:multi-Objective  fuzzy model  hydroelectric station  installed capacity
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水运工程学报》浏览原始摘要信息
点击此处可从《水利水运工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号