首页 | 本学科首页   官方微博 | 高级检索  
     


65-MW gas-turbine system for renovation of the Mosénergo TÉTs-9 heating and electric power plant
Authors:V P Kovalevskii  A S Lebedev  A G Sergeev  V Ya Nekrasov  P A Berezinets  T A Suponina  V E Mikhailov
Affiliation:(1) School of Electrical Sciences, VIT University, 632 014 Vellore, TN, India;(2) Mechanical Engineering Department, Indian Institute of Technology, HAUS KHAS, 110 016 New Delhi, India
Abstract:Thermal layouts are examined for condensation-type steam-gas systems with one, two, and three boiler-utilizer pressure stages based on the GTé-65 gas-turbine power generating system and the PT 60-12.7_1.27 steam turbine. The operational efficiency and feasibility of integrating a GTé-65 and a Pr-86-13.72-545 boiler-utilizer with a single pressure stage in the existing thermal layout of the TéTs-9 plant of Mosénergo (a station with crosslinks) within the main housing at the location of a no longer operating R-50-12.7_1.27 steam turbine and PTVM-100 water heating boiler are demonstrated.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号