首页 | 本学科首页   官方微博 | 高级检索  
     

新型电力系统下电力用户的需求响应潜力评估
引用本文:王樊云,刘敏,李庆生,陈巨龙,李震.新型电力系统下电力用户的需求响应潜力评估[J].电测与仪表,2023,60(8):105-113.
作者姓名:王樊云  刘敏  李庆生  陈巨龙  李震
作者单位:贵州大学,贵州大学,贵州电网有限责任公司电网规划研究中心,贵州电网有限责任公司电网规划研究中心,贵州电网有限责任公司电网规划研究中心
基金项目:贵州省科技计划项目资助(黔科合支撑[2021]一般409)
摘    要:需求响应(Demand Response, DR)是在用户进行电力消费环节,通过价格信号或激励措施使得用户改变用电模式,对推动电力市场化改革、减少电网供电压力意义重大。文章分析总结了新型电力系统下需求响应的特点,在此基础上从用户负荷、用户参与意愿度、智能化水平和经济性4个维度构建了DR潜力评估指标体系;利用层次分析法和CRITIC法来确定各指标的主观权重和客观权重,求取组合权重;建立改进物元可拓模型,并应用所建立指标体系和评估模型对实际调研的10个用户响应潜力进行评估排名,证明了所提方法的科学性与有效性。采用简化后的模型对96个用户进行潜力评估,并比较在不同补贴激励下的潜力大小。结果表明,对于价格敏感性用户,补贴激励越高,用户的响应潜力越大。

关 键 词:DR  潜力评估  层次分析法  CRITIC方法  物元可拓模型
收稿时间:2022/12/24 0:00:00
修稿时间:2023/2/10 0:00:00

Evaluation of demand response potential of power users in new power system
wang fanyun,LIU MIN,LI QINGSHENG,CHEN JULONG and LI ZHEN.Evaluation of demand response potential of power users in new power system[J].Electrical Measurement & Instrumentation,2023,60(8):105-113.
Authors:wang fanyun  LIU MIN  LI QINGSHENG  CHEN JULONG and LI ZHEN
Affiliation:Guizhou University,Guizhou University,Power Grid Planning and Research Center of Guizhou Power Grid Co, Ltd,Power Grid Planning and Research Center of Guizhou Power Grid Co, Ltd,Power Grid Planning and Research Center of Guizhou Power Grid Co, Ltd
Abstract:Demand Response (DR) is to make users change their electricity consumption mode through price signal or incentive measures in the electricity consumption link, which is of great significance in promoting the power market reform and reducing the power supply pressure of the grid. Based on the analysis of the characteristics of demand response under the new power system, the DR potential evaluation index system is constructed from four aspects of user load, user willingness to participate, intelligent level and economy; Secondly, AHP and CRITIC are used to determine the subjective weight and objective weight of each index, and the combined weight is calculated. Then, an improved matter-element extension model is established to evaluate the DR potential of each user. The established index system and evaluation model are used to evaluate and rank the DR potential of 10 users, which proves the scientificity and effectiveness of the proposed method. Finally, the simplified model is used to evaluate the potential of 96 users and compare the potential under different subsidy incentives.The results show that for price sensitive users, the higher the subsidy incentive, the greater the response potential of users.
Keywords:DR  Potential assessment  Analytic Hierarchy Process  CRITIC method  Matter element extension model
点击此处可从《电测与仪表》浏览原始摘要信息
点击此处可从《电测与仪表》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号