首页 | 本学科首页   官方微博 | 高级检索  
     

龙滩水电站700MW全空冷水轮发电机运行分析
引用本文:王鹏宇,马跃东. 龙滩水电站700MW全空冷水轮发电机运行分析[J]. 水力发电, 2010, 36(1)
作者姓名:王鹏宇  马跃东
作者单位:龙滩水电开发有限公司,广西天峨,547300
摘    要:龙滩水电站是我国继三峡水电站之后又一安装700 MW巨型水轮发电机组的特大型水电工程。在水轮发电机设计、选型、制造等方面摒弃传统观念,采用全空冷技术,并采取了一些与之相适应的技术措施。近2年的安全稳定运行也证明了选型、设计、制造的合理性,可为国内外水电行业提供参考。

关 键 词:全空冷  水轮发电机  分析  龙滩水电站

Operation Analysis of the 700MW Fully Air-cooled Generator of Longtan Hydropower Station
Wang Pengyu,Ma Yuedong. Operation Analysis of the 700MW Fully Air-cooled Generator of Longtan Hydropower Station[J]. Water Power, 2010, 36(1)
Authors:Wang Pengyu  Ma Yuedong
Affiliation:Wang Pengyu,Ma Yuedong(Longtan Hydropower Development Co.,Ltd.,Tian'e Guangxi 547300)
Abstract:The 700 MW hydro generators in Longtan Hydropower Station are fully air cooled.Many special concepts and corresponding technical measures are used in the design,selection and manufacture.After two years safe operation,the design,selection and manufacture has been proved to be reasonable.
Keywords:fully air-cooled  hydro-generator  analysis  Longtan Hydropower Station  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号