首页 | 本学科首页   官方微博 | 高级检索  
     

沈家坡滑坡整治工程预应力锚索施工试验
引用本文:刘刚.沈家坡滑坡整治工程预应力锚索施工试验[J].湖北水力发电,2005(4):36-38.
作者姓名:刘刚
作者单位:湖北清江工程监理有限公司,湖北,宜昌,443000
摘    要:沈家坡滑坡体治理的主要工程措施之一是预应力锚索锚固,为了验证锚固设计、施工工艺、施工机具和施工参数,选择了两根预应力锚索进行现场试验,为后续施工的顺利进行提供了保证。

关 键 词:滑坡体治理  预应力锚索锚固  现场试验
修稿时间:2005年7月1日

Construction Test on Prestressed Cables for Regulating Works of Shenjiapo Slidingmass
Liu Gang.Construction Test on Prestressed Cables for Regulating Works of Shenjiapo Slidingmass[J].Hubei Water Power,2005(4):36-38.
Authors:Liu Gang
Abstract:The Shenjiapo slidingmass is regulated by means of prestressed cable anchoring as a major engineering measure.Before the regulating works is started,the design scheme and the construction machines,tools,technologies and parameters are verified by the test on two prestressed cables in situ,the detail includes: test of concrete material properties and mix proportion,positioning,drilling and cleaning of cable holes,static pressure test,concrete placing of anchorage piers,grouting of cable holes,tensioning and elongation measuring of prestressed cables,etc.
Keywords:regulation of slidingmass  prestressed cable anchorage  test in situ  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号