首页 | 本学科首页   官方微博 | 高级检索  
     

青铜峡水电站半门式起重机三维有限元分析
引用本文:王延斌 魏茂基. 青铜峡水电站半门式起重机三维有限元分析[J]. 西北电力技术, 1999, 27(6): 42-46
作者姓名:王延斌 魏茂基
作者单位:西北电力试验研究院!西安710054
摘    要:青铜峡水电厂4 号半门式起重机投入运行已三十余年。为了全面地了解该门机的整体性态,进行了计算。计算结果指出:门机结构总体应力水平较低,其严重受力件主梁具有较大的强度富裕度,不必更换。建议厂方在这次计算的基础上,进行实际测试,以便进一步校核该门机的强度和变位。

关 键 词:半门式  起重机  有限元  应力  变位  评价

3D Finite Element Analysis of Semi-portal Crane at Qingtong Gorge Hydropower Station
Wang Yanbin et al. 3D Finite Element Analysis of Semi-portal Crane at Qingtong Gorge Hydropower Station[J]. Northwest China Electric Power, 1999, 27(6): 42-46
Authors:Wang Yanbin et al
Abstract:Semi-portal crane No.4 has been put into operation for 30 years at Qingtong Gorge Hydropower Station. For completely understanding the integral performance and condition of this crane, a calculation has been carried out. The results show that the crane is unnecessary to replace for its low total stress level and large strength margin of the main girder (main stressed part). It is suggested that a practical measurement shall be conducted again so as to further check the strength and displacement of this crane on the basis of this calculation.
Keywords:semi-portal crane finite element stress displacement evaluation  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号