首页 | 本学科首页   官方微博 | 高级检索  
     

浅谈现浇预应力箱梁施工技术
引用本文:李贞场. 浅谈现浇预应力箱梁施工技术[J]. 山西建筑, 2008, 34(21)
作者姓名:李贞场
作者单位:临沂交通工程咨询监理中心,山东临沂,276000
摘    要:针对现浇箱梁施工中支架检算时的荷载组合、支架的基础处理、支架的稳定性等问题,结合粮库大桥预应力箱梁施工实例,阐述了现浇梁施工中采用的支架体系及其设计,详细的总结了粮库大桥现浇预应力箱梁的施工工艺和施工方法。

关 键 词:现浇混凝土  预应力箱梁  支架体系  施工技术

On the construction technology of the cast-in-place prestressed box beam
LI Zhen-chang. On the construction technology of the cast-in-place prestressed box beam[J]. Shanxi Architecture, 2008, 34(21)
Authors:LI Zhen-chang
Affiliation:LI Zhen-chang
Abstract:According to the load combination,the foundation treatment of the scaffold,the stability of the scaffold in the support checking in the construction of the cast-in-place box beam,the author describes the scaffolding system and the design in the construction of the cast-in-place beam combined with the construction of the prestressed box beam of the grain depot bridge,detailedly summarizes the construction technology and the construction method of the cast-in-place prestressed box beam of the grain depot bridge.
Keywords:cast-in-situ concrete  prestressed box beam  scaffolding system  construction technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号