浅谈高速铁路32m预制箱梁施工技术
引用本文:董强.浅谈高速铁路32m预制箱梁施工技术[J].安徽建筑,2007,14(1):28-29.
作者姓名:董强
作者单位:中铁四局集团第一工程有限公司,安徽,合肥,230041
摘    要:文章结合合(肥)武(汉)高速铁路32m预制箱梁的现场施工,浅谈高位法预制高速铁路32m箱梁的施工技术,并着重介绍了预制箱梁的施工工艺。

关 键 词:高速铁路  预制箱梁  制梁工艺
文章编号:1007-7359(2007)01-0028-02
修稿时间:2006-12-19

On Construction Technique of the Box Beam (32 m in length) for the Express Railway
Dong Qiang.On Construction Technique of the Box Beam (32 m in length) for the Express Railway[J].Anhui Architecture,2007,14(1):28-29.
Authors:Dong Qiang
Affiliation:The First Engineering Co., Ltd. of CTCE Group, Hefei 230041, China
Abstract:In combination with the site construction of the box beam,which is of 32m in length,for the Express Railway Hefei-Wuhan,the construction with perching method is discussed and the construction process is especially introduced in this article.
Keywords:express railway  precast box beam  process of beam fabrication