某抽水蓄能电站上水库防渗帷幕深度优选研究
引用本文:杨金孟,赵兰浩,沈振中,甘 磊,徐力群. 某抽水蓄能电站上水库防渗帷幕深度优选研究[J]. 水资源与水工程学报, 2021, 32(2): 209-216
作者姓名:杨金孟  赵兰浩  沈振中  甘 磊  徐力群
作者单位:(1.河海大学 水文水资源与水利工程科学国家重点实验室, 江苏 南京 210098; 2.河海大学 水利水电学院, 江苏 南京 210098)
基金项目:国家自然科学基金/雅砻江联合基金项目(U1765205);江苏高校优势学科建设工程项目(水利工程)(YS11001)
摘    要:针对某抽水蓄能电站上水库地质条件较为复杂、库区存在两条由库内延伸到库外的中等宽度断层、副坝区基岩弱风化层较厚的特点,以及设计防渗方案不合理的问题,根据上库工程坝址区的地质结构、地形地貌及防渗帷幕设计,建立了三维有限元渗流分析模型.首先通过参数及地下水位反演确定了库区基岩的渗透系数和水库特征点处的地下水位,然后在设计防渗...

关 键 词:抽水蓄能电站  水库防渗帷幕  防渗帷幕深度优化  渗流模拟  方案优选

Depth optimization of anti seepage curtain of the upper reservoir in a pumped storage power station
YANG Jinmeng,ZHAO Lanhao,SHEN Zhenzhong,GAN Lei,XU Liqun. Depth optimization of anti seepage curtain of the upper reservoir in a pumped storage power station[J]. Journal of water resources and water engineering, 2021, 32(2): 209-216
Authors:YANG Jinmeng  ZHAO Lanhao  SHEN Zhenzhong  GAN Lei  XU Liqun
Abstract:According to the complex geological conditions of the upper reservoir of a pumped storage power station, there are two medium width faults extending from the inside to the outside of the reservoir and the weak weathering layer of the foundation rock mass in the auxiliary dam area is relatively thick. In addition, the designed anti seepage scheme is impracticable. To address these problems, we established a three dimensional finite element seepage analysis model based on the geological structure, topography and anti seepage curtain design of the reservoir. The permeability coefficients of the foundation rock mass in the reservoir area and the groundwater levels at the typical points of the reservoir were firstly determined through inversion, then the effect of different depths of the anti seepage curtain on the seepage field, seepage flow and seepage gradients of different parts of the reservoir were analyzed and quantified, and based on which the optimal scheme of the depth of the anti seepage curtain was obtained. The results show that the depth of the anti seepage curtain near the faults at the riverbed and the periphery of the reservoir should be increased by 10 m. The depth of the left and right dam abutments should be respectively reduced by 10 m according to 3 Lu standard. The depth at the periphery of the reservoir with no fault and auxiliary dam should be reduced by 10 m. The research results can serve as a reference for the depth optimization of anti seepage curtain of similar hydraulic engineering.
Keywords:pumped storage power station   anti seepage curtain of reservoir   depth optimization anti seepage curtain   seepage simulation   optimal scheme