首页 | 本学科首页   官方微博 | 高级检索  
     

浅析大渡河龙头石水电站大坝截流设计及施工
引用本文:付亚东,张强,魏艳. 浅析大渡河龙头石水电站大坝截流设计及施工[J]. 四川水力发电, 2008, 27(Z1)
作者姓名:付亚东  张强  魏艳
作者单位:中国水利水电第五工程局有限公司,四川,成都,610066
摘    要:为了保证龙头石水电站截流施工的安全与质量,结合施工现场实际情况,对截流施工做了详细的方案设计,通过大坝截流的顺利实施,完全体现了截流设计的必要性和合理性.

关 键 词:大坝  截流  方案设计  龙头石水电站  实施

River Closure Design and Construction for Longtoushi Hydropower Station on Dadu River
FU Ya-dong,ZHANG Qiang,WEI Yan. River Closure Design and Construction for Longtoushi Hydropower Station on Dadu River[J]. Sichuan Water Power, 2008, 27(Z1)
Authors:FU Ya-dong  ZHANG Qiang  WEI Yan
Affiliation:FU Ya-dong ZHANG Qiang WEI Yan(Sinohydro Engineering Bureau 5 Corporation,Chengdu,Sichuan,610066,China)
Abstract:River closure works at Longtoushi hydropower station includes closure of Dadu river,placement of upstream and downstream cofferdams,dam and powerhouse construction.This is one of the technical problems in Longtoushi hydropower project development.In order to ensure river closure construction safety and quality,the detailed construction scheme design for river closure is performed based on actual conditions in construction site.Successful river closure proves necessity and rationality of river closure design...
Keywords:dam  river closure  design  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号