摘    要:针对芦家山一号隧道断面大、围岩破碎且存在浅埋段、渗漏水严重等特点,采取了大管棚超前支护、双侧壁导坑开挖、加强监控量测、围岩预注浆等一系列技术措施,从而确保了芦家山一号隧道的顺利完工。

关 键 词:隧道  大管棚施工  双侧壁法  监控量测  施工技术

On construction technology of large cross-section tunnel
ZHAO Hai-qin. On construction technology of large cross-section tunnel[J]. Shanxi Architecture, 2009, 35(3): 300-301
Authors:ZHAO Hai-qin
Affiliation:ZHAO Hai-qin
Abstract:In view of the characteristics of No.1 Lujiashan tunnel,such as large cross-section,fractured surrounding rock with partial shallow cover and serious leakage and so on a series technological measures are proposed,which includes advanced support of large-pipe-shed,double side-drift method,strengthening monitoring,consolidation treatment of surrounding rock by grouting and so on in order to ensure satisfied completion of this tunnel work.
Keywords:tunnel  large-pipe-shed construction  double sidedrift method  monitoring and measuring  construction technology