螺丝湾水电站引水隧洞施工前后围岩工程地质条件评价
引用本文:肖红光. 螺丝湾水电站引水隧洞施工前后围岩工程地质条件评价[J]. 云南水力发电, 1999, 15(3): 10-12
作者姓名:肖红光
作者单位:国家电力公司昆明勘测设计研究院!云南昆明650051
摘    要:螺丝湾电站引水隧洞总长5041 m ,沿线主要为二迭系玄武岩,岩石坚硬。但断层、挤压破碎带及裂隙发育,据开挖揭露出的大小断层共50 条,挤压破碎带183 条,隧洞经过这些地段,对围岩稳定有一定影响。总的说开挖前对地层岩性、地质构造、工程地质及水文地质条件的评价与开挖后的情况基本一致

关 键 词:螺丝湾电站  引水隧洞施工  工程地质评价

Assessment of Surrounding Rock Engineering Geological Conditions of Power Tunnel for Luosiwan Hydropower Station
XIAO Hong-guang. Assessment of Surrounding Rock Engineering Geological Conditions of Power Tunnel for Luosiwan Hydropower Station[J]. Yunnan Water Power, 1999, 15(3): 10-12
Authors:XIAO Hong-guang
Abstract:The power tunnel of the Luosiwan hydropower station, 5,041m long, is located in an area that consists mainly of Permian hard basalt, and is however characterized by developed faults, compressive fractured zones and fissures. Altogether 50 large and small faults and 183 compressive fractured zones were exposed during excavation. The rock excavation for the tunnel had certain impact on its surrounding rocks. The assessment of strata rock properties, geological structure, engineering geology and hydrogeology made before excavation is in line with that exposed after excavation.
Keywords:Luosiwan Hydropower Station  construction of power tunnel  assessment of engineering geology