摘    要:2008 年10-12 月,在220 kV新港输电工程中,对位于烟台开发区九目山顶的38 号、39 号、40 号直线塔进行了全方位高低腿的扩底锚桩基础施工,与板式基础相比降低造价58.8%。试验单锚桩由6.8 级螺栓(材质40Cr)的锚杆、C30 型混凝土构成,单锚桩底部为扩大端;根据带锚板的热镀锌锚杆和未镀锌锚杆的2 组对比试验数据分析可知,带锚板的热镀锌锚杆可以作为基础锚杆,解决了锚杆的混凝土保护层不够的问题。经力学分析,基础锚杆选用高强钢8.8 级螺栓,直锚4 桩结构可改为直锚双桩结构,从而进一步降低造价40%左右。

关 键 词:输电线路  强风化岩  扩底锚桩基础  板式基础  经济比较  双桩结构  高强钢锚杆  

Application of the Enlarged Base Anchor Pile in the 220 kV Xingang Power Transmission Project
WANG Mao-cheng,FAN Shi-feng,MENG Qing-bo,LI Qiang,LIU De-hua,YU Bin,BAI Yu-shi.Application of the Enlarged Base Anchor Pile in the 220 kV Xingang Power Transmission Project[J].Electric Power Construction,2010,31(8):21-24.
Authors:WANG Mao-cheng  FAN Shi-feng  MENG Qing-bo  LI Qiang  LIU De-hua  YU Bin  BAI Yu-shi
Affiliation:WANG Mao-cheng1,FAN Shi-feng2,MENG Qing-bo3,LI Qiang4,LIU De-hua4,YU Bin3,BAI Yu-shi3(1.Yantai Electrical Power Design Institute,Yantai 264002,Shandong Province,China,2.Shandong Electric Power Corporation,Jinan 250001,3.Hainan Zhonghai Electric Power Engineering Corporation,Haikou 570003,4.Yantai Electric Power Company,Yantai 264000,China)
Abstract:The enlarged base anchor pile foundation was adopted for the NO.38,39 and 40 suspension towers of the 220 kV Xingang power transmission project,as a result reducing the cost by 58.8% compared with the slab-foundation.The experimental single anchor pile consisted of 6.8-class bolts(material quality 40Cr) and C30 concrete with an expanded base,According to a comparison of the testing data of the hot-galvanized anchor rod and the no-galvanized anchor rod,the galvanized anchor rod with an anchoring plate can be...
Keywords:transmission line  strongly weathered rock  enlarged base anchor pile foundation  slab-foundation  economic comparison  bi-pile foundation  high-strength steel anchor bolt  