首页 | 本学科首页   官方微博 | 高级检索  
     


Minimizing Total Tardiness: A Case Study in an Autoparts Factory
Authors:Leandro Kiyuzato  Debora P Ronconi  Rodribo Salamoni  Chana K Tsai  & Hugo Yoshizaki
Affiliation:Production Engineering Dept., Polytechnic School, University of Sao Paulo, Brazil
Abstract:The application of heuristic procedures for solving a real scheduling problem that arises in an autoparts factory is reported in this paper. Due to the characteristics of the environment, the measure of performance considered is the minimization of the total tardiness of the jobs. The original problem is reduced to the single machine scheduling problem, and the dispatching rules EDD (earliest due date), SPT (shortest processing time), and the PSK algorithm are used to obtain approximate solutions. Computational tests and a comparison with the usual schedule are presented.
Keywords:scheduling  single machine  total tardiness  heuristic  case study
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号