High Temperature Low Sag Upgrades and Payback for the Economic Operation Improvement of Power Transmission Systems |
| |
Authors: | Askhat Tokombayev |
| |
Affiliation: | School of Electrical, Computer and Energy Engineering, Arizona State University, Tempe, Arizona, USA |
| |
Abstract: | Abstract—The increase of transmission line thermal ratings by reconductoring with high temperature low sag conductors is a comparatively new technology introduced for transmission expansion. A special design permits high temperature low sag conductors to operate at higher temperatures, therefore allowing passage of higher current and, thus, increasing the thermal rating of the transmission line. The comparatively high cost of high temperature low sag conductors may be an obstacle to its large-scale implementation. This article evaluates the expenditures for transmission line reconductoring using high temperature low sag, the consequent benefits obtained from the potential decrease in operating cost for thermally limited power transmission systems. Estimates of the “payback period” are used to evaluate the cost effectiveness of reconductoring with high temperature low sag. The evaluation is performed using a 225 bus equivalent of the 2012 summer peak Arizona portion of the Western Electricity Coordinating Council. The method is offered for transmission expansion analysis in which an economic benefit is calculated to assist in the transmission expansion decision. |
| |
Keywords: | High temperature low sag transmission engineering optimal dispatch economic efficiency payback period |
|
|