首页 | 本学科首页   官方微博 | 高级检索  
     

新型无缝线路温度内力测试系统的研制
引用本文:刘永前,王建文.新型无缝线路温度内力测试系统的研制[J].计量学报,2006,27(2):145-148.
作者姓名:刘永前  王建文
作者单位:1. 石家庄铁道学院大型结构研究所,河北,石家庄,050043;河北省大型结构健康诊断与控制重点实验室,河北,石家庄,050043
2. 石家庄铁路分局公务段,河北,石家庄,050000
摘    要:研究出无缝线路上钢轨在温度发生变化时轴向温度内力的一种有效检测手段,并提出了新颖的理论和方法.通过建立无缝线路轨道力学模型分析温度内力变化时侧向力及其作用位移的变化规律,研制了新型无缝线路温度内力测试系统,结合标定试验对上述规律进行了参数修正,最终实现对钢轨温度力的精确测试.此项技术在实践应用中取得良好效果.

关 键 词:计量学  无缝线路  温度内力  测试系统  标定试验
文章编号:1000-1158(2006)02-0145-04
收稿时间:2005-06-25
修稿时间:2005-08-09

A New Testing System on Internal Force Caused by Temperature Changing of Continuous Welded Rail Track
LIU Yong-qian,WANG Jian-wen.A New Testing System on Internal Force Caused by Temperature Changing of Continuous Welded Rail Track[J].Acta Metrologica Sinica,2006,27(2):145-148.
Authors:LIU Yong-qian  WANG Jian-wen
Affiliation:1. Structural Health Monitoring and Control Institute, Shijiazhuang Railway Institute, Shijiazhuang, Hebei 050043, China; 2. Key Laboratory of Structural Health Monitoring and Control of Hebei Province, Shijiazhuang, Hebei 050043, China; 3. Shijiazhuang Railway Subbureau, Shijiazhuang, Hebei 050000, China
Abstract:A new theory and principle for a kind of effective testing method of axial internal force of continuous welded rail track when the temperature changes are presented. A mechanical model of continuous welded rail is established to investigate the alteration regular of the lateral force and the effects displacement when the temperature changes. A new testing system on internal force caused by temperature changing of the rail used in continuous welded rail track is developed, parameter amendment is done associated with the calibration experiment and accurate test of rail axial internal force is fulfilled finally. This technology achieves a good effectiveness in practical application.
Keywords:Metrology  Continuous welded rail  Internal force caused by temperature changing  Testing system  Calibration experiment
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号