1030MW机组汽轮机汽门调试中出现的问题分析
引用本文:赵琦,张宝,胡洲. 1030MW机组汽轮机汽门调试中出现的问题分析[J]. 浙江电力, 2014, 0(11): 69-72
作者姓名:赵琦  张宝  胡洲
作者单位:国网浙江省电力公司电力科学研究院,杭州310014
摘    要:在进行某1 030 MW机组汽轮机汽门调试时,发现由于控制逻辑、设备安装与油质控制等问题导致调门工作多次出现异常,分析和处理后问题得到了解决,经汽门快关时间测试,各汽门均满足相关要求,在设备出厂、资料交付、油质控制、现场安装与调试等方面给出了相应建议.

关 键 词:1030MW机组  汽轮机  汽门  电磁阀

Problem Analysis on Steam Turbine Valves Commissioning of 1 030 MWUnits
ZHAO Qi,ZHANG Bao,HU Zhou. Problem Analysis on Steam Turbine Valves Commissioning of 1 030 MWUnits[J]. Zhejiang Electric Power, 2014, 0(11): 69-72
Authors:ZHAO Qi  ZHANG Bao  HU Zhou
Affiliation:(State Grid Zhejiang Electric Power Research Institute,Hangzhou 310014,China)
Abstract:During steam valves commissioning of 1 030 MW unit steam turbine,abnormities due to controllogic, equipment installation and oil quality control are detected in the commissioning work and finally get e-liminated through analysis and treatment. After test on fast shutdown time,it is proved that all the steamvalves can meet the requirements; moreover,suggestions on equipment delivery,document handover,oilquality control, field installation and commissioning are given in this paper.
Keywords:1 030 MW units  steam turbine  steam valve  solenoid valve