首页 | 本学科首页   官方微博 | 高级检索  
     

强夯法在重庆市户外变电站地基处理中的应用
引用本文:陈伟宏,付伟. 强夯法在重庆市户外变电站地基处理中的应用[J]. 山西建筑, 2012, 0(22): 90-92
作者姓名:陈伟宏  付伟
作者单位:国核电力规划设计研究院
摘    要:针对目前重庆市户外变电站实际情况,通过深入研究强夯机理,并参考了用强夯法处理山区块石回填地基的相关工程实例后,认为当填筑厚度不超过5 m时,合理选择强夯参数和施工工艺,可以对爆破后的山区块石与土料进行强夯处理。

关 键 词:强夯法  地基处理  户外变电站  山区

Application of dynamic compaction method in outdoor substation foundation treatment in Chongqing city
CHEN Wei-hong,FU Wei. Application of dynamic compaction method in outdoor substation foundation treatment in Chongqing city[J]. Shanxi Architecture, 2012, 0(22): 90-92
Authors:CHEN Wei-hong  FU Wei
Affiliation:(State Nuclear Electric Power Planning Design & Research Institute,Beijing 100095,China)
Abstract:In light of current outdoor substation conditions in Chongqing city,through in-depth studying the dynamic compaction mechanism and referring to relevant stone-backfilling foundation engineering case in mountainous area with dynamic compaction method,the author of the paper thinks that: when the filling thickness is less than 5 m,the dynamic compaction treatment of the stones in mountainous area and earth can be carried out through selecting rational construction parameters and construction technology.
Keywords:dynamic compaction method  foundation treatment  outdoor substation  mountainous area