首页 | 本学科首页   官方微博 | 高级检索  
     

跨越有水河道现浇梁施工
引用本文:吉洪茂. 跨越有水河道现浇梁施工[J]. 山西建筑, 2012, 0(23): 212-213
作者姓名:吉洪茂
作者单位:河北建设集团路桥分公司
摘    要:分析了某工程跨越有水河道进行现浇梁施工的难度,探讨了具体施工方案,通过采用临时支墩+钢管桩+贝雷梁组合跨越,顺利解决了施工难题,为今后同类工程积累了宝贵经验。

关 键 词:现浇梁  施工方案  钢管桩  贝雷梁

On cast-in-situ beam construction across wet river channel
JI Hong-mao. On cast-in-situ beam construction across wet river channel[J]. Shanxi Architecture, 2012, 0(23): 212-213
Authors:JI Hong-mao
Affiliation:JI Hong-mao (Road and Bridge Branch of Hebei Construction Group,Baoding 071000,China)
Abstract:The paper analyzes the difficulties in the cast-in-situ beam construction across the wet river channel in some project,explores the factual engineering scheme,adopts the composite crossing with temporary buttress,steel pipe pile and bailey beam,and solves the construction difficulties,so as to accumulate precious experience for similar projects in future.
Keywords:cast-in-situ beam  construction scheme  steel pipe pile  bailey beam
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号