Scheduling with due date assignment under special conditions on job processing
Authors:Valery Gordon  Vitaly Strusevich  Alexandre Dolgui
Affiliation:1. School of Computing and Mathematical Sciences, Old Royal Naval College, University of Greenwich, Park Row, Greenwich, SE10 9LS, London, UK
2. Industrial Engineering and Computer Science Centre, Ecole des Mines de Saint Etienne, 158 cours Fauriel, 42023, Saint Etienne Cedex 2, France
Abstract:We review the results on scheduling with due date assignment under such conditions on job processing as given precedence constraints, maintenance activity or various scenarios of processing time changing. The due date assignment and scheduling problems arise in production planning when the management is faced with setting realistic due dates for a number of jobs. Most research on scheduling with due date assignment is focused on optimal sequencing of independent jobs. However, it is often found in practice that some products are manufactured in a certain order implied, for example, by technological, marketing or assembly requirements and this can be modeled by imposing precedence constraints on the set of jobs. In classical deterministic scheduling models, the processing conditions, including job processing times, are usually viewed as given constants. In many real-life situations, however, the processing conditions may vary over time, thereby affecting actual durations of jobs. In the models with controllable processing times, the scheduler can speed up job execution times by allocating some additional resources to the jobs. In the models with deterioration or learning, the actual processing time can depend either on the position or on the start time of a job in the schedule. In scheduling with deterioration, the later a job starts, the longer it takes to process, while in scheduling with learning, the actual processing time of a job gets shorter, provided that the job is scheduled later. We consider also scheduling models with optional maintenance activity. In manufacturing processing, production scheduling with preventive maintenance planning is one of the most significant methods in preventing the machinery from failure or wear.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号