首页 | 本学科首页   官方微博 | 高级检索  
     

港珠澳大桥环岛挡浪墙素清水混凝土裂缝控制技术研究
引用本文:陈克伟,孙振平,王成启,谷坤鹏.港珠澳大桥环岛挡浪墙素清水混凝土裂缝控制技术研究[J].新型建筑材料,2019(4):1-4.
作者姓名:陈克伟  孙振平  王成启  谷坤鹏
作者单位:同济大学材料科学与工程学院;中交上海三航科学研究有限公司
基金项目:国家自然科学联合基金项目(U1534207);国家自然科学基金项目(51678441);上海市经信委专项资金项目(沪CXY-2016-012)
摘    要:港珠澳大桥东人工岛护岸挡浪墙属于大体积素清水混凝土长墙结构,内部无钢筋。在分段长度为9 m前提下,通过足尺寸模型研究挡浪墙裂缝发展规律,并寻求有效的裂缝控制技术。试验结果表明:不采取内部降温措施情况下,挡浪墙体的内部温升为45.9 ℃,应变为126×10^-6,墙体出现3条裂缝;墙体内布设1层和2层冷却水管情况下,内部最高温度分别降低9.2 ℃和14.1 ℃;墙体内布设2层冷却水管,控制侧墙与底板浇筑间隔时间不超过10 d,墙体无裂缝产生。

关 键 词:港珠澳大桥  挡浪墙  清水混凝土  足尺寸模型  冷却水管

Study on crack control technology for fair-faced concrete of the protection wall in the east artificial island of HongKong-Zhuhai-Macao Bridge
CHEN Kewei,SUN Zhenping,WANG Chengqi,GU Kunpeng.Study on crack control technology for fair-faced concrete of the protection wall in the east artificial island of HongKong-Zhuhai-Macao Bridge[J].New Building Materials,2019(4):1-4.
Authors:CHEN Kewei  SUN Zhenping  WANG Chengqi  GU Kunpeng
Affiliation:(School of Materials Science and Engineering of Tongji University,Shanghai 201804,China;CCCC Shanghai Third Harbour Engineering Academy of Science Co. Ltd.,Shanghai 200032,China)
Abstract:The protection wall in the east artificial island of Hongkong-Zhuhai-Macao Bridge is a mass concrete structure,also long wall structure. Supposing the length of the wall is 9 meters,the paper researches the development law of cracks in the retaining wall through full-scale model test,and researches effective crack control technology. The research results show that:without internal cooling control measures,the internal temperature rise of the wall is 45.9 ℃ and the strain is 126×10^-6. At the same time,there will be three cracks in the wall. The highest temperature inside the wall is reduced by 9.2 ℃ by placed one layer of cooling water pipe,and reduced by 14.1 ℃ by placed two layers of cooling water pipe. When two-layer cooling water pipes are arranged in the wall and the construction time interval between the bottom plate and the wall is not more than 10 days,there is no crack in the wall.
Keywords:Hongkong-Zhuhai-Macao Bridge  protection wall  fair-faced concrete  full-scale model  cooling water pipe
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号