首页 | 本学科首页   官方微博 | 高级检索  
     

低渗透油藏CO2驱油数值模拟方法与应用
引用本文:鞠斌山,于金彪,吕广忠,曹伟东.低渗透油藏CO2驱油数值模拟方法与应用[J].油气地质与采收率,2020,27(1):126-133.
作者姓名:鞠斌山  于金彪  吕广忠  曹伟东
作者单位:1.中国地质大学(北京)能源学院,北京100083;,2.中国石化胜利油田分公司勘探开发研究院,山东东营257015,2.中国石化胜利油田分公司勘探开发研究院,山东东营257015,2.中国石化胜利油田分公司勘探开发研究院,山东东营257015
基金项目:国家科技重大专项“大型油气田及煤层气开发”(2016ZX05011),中国石化重大项目“低渗透油藏地质建模及CO2驱数值模拟技 术研究”(P18088-1)。
摘    要:为弄清正理庄油田樊142块CO2驱油前缘特征和驱油效果,开展CO2驱油数值模拟方法和采油井开井顺序研究。利用多相渗流理论和数值求解技术,研制全隐式CO2驱油油藏数值模拟器。运用地质和生产资料分析和数值模拟相结合的手段,研究了压力恢复阶段连续注入CO2油层中CO2的分布和前缘推进情况。发现CO2前缘存在明显指进,注入2 a后,前缘已到达樊142-6-2井,前缘距樊142-6-3井和樊141-1-1井的最短距离分别为52和45 m。低压区的樊142-8-3和樊142-7-3井先开井,生产1 a后其余4口井再开井生产为最佳方案,该方案比同时开井累积生产5 a的采收率高1.34%,增产油量为5 407 t。通过采出程度、CO2埋存率和换油率对比可以看出开井顺序对驱油效果影响显著。

关 键 词:CO2驱油  驱油前缘  数值模拟  采收率  开井顺序优化  低渗透油藏

Numerical simulation method and application of CO2 flooding in low permeability reservoirs
JU Binshan,YU Jinbiao,LV Guangzhong,CAO Weidong.Numerical simulation method and application of CO2 flooding in low permeability reservoirs[J].Petroleum Geology and Recovery Efficiency,2020,27(1):126-133.
Authors:JU Binshan  YU Jinbiao  LV Guangzhong  CAO Weidong
Affiliation:(School of Energy Resources,China University of Geosciences(Beijing),Beijing City,100083,China;Exploration and Development Research Institute,Shengli Oilfield Company,SINOPEC,Dongying City,Shandong Province,257015,China)
Abstract:In order to clarify the characteristics of front and displacement efficiency of CO2 flooding in Fan142 Block,Zhenglizhuang Oilfield,a numerical simulation method for CO2 flooding and the optimization for well open sequence for oil wells are studied. A fully-implicit reservoir numerical simulator for CO2 flooding is developed by using the multiphase percolation theory and the numerical solution technique. Combining the geological/production data analysis and oil reservoir simulation,the distribution of CO2 and the displacement front of the block are studied during the pressure build-up stage by continuous CO2 injection. It is found that an obvious fingering phenomenon occurs at the CO2 flooding front. After 2 years of injection,the front has reached Well F142-6-2. The shortest distances from the front to Well F142-6-3 and F141-1-1 are 52 m and 45 m,respectively. The best scheme is that wells F142-8-3 and F142-7-3 in the low pressure area are first opened and the remaining 4 wells are opened for production after 1 year. The cumulative production for 5 years of this scheme is 1.34% higher than that of the scheme that the wells are opened at the same time,and the increase of oil production is 5 407 t. By comparing the oil recoveries,geological sequestration rates and replacement rates of CO2,it is indicated that the sequence of well opening have an significant effect on the displacement efficiency.
Keywords:CO2 flooding  oil displacement front  numerical simulation  oil recovery  optimization for well open sequence  low permeability reservoirs
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《油气地质与采收率》浏览原始摘要信息