New integration of preventive maintenance and production planning with cell formation and group scheduling for dynamic cellular manufacturing systems
Affiliation:1. School of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran;2. School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran;1. Department of Mechanical Engineering, Guru Jambheshwar University of Science & Technology, Hisar, HR, India;2. Department of Mechanical Engineering, Sant Longowal Institute of Engineering & Technology, Longowal, PB, India;1. Faculty of Integrated Technologies, Universiti Brunei Darussalam, Jalan Tungku Link, Gadong, BE1410, Brunei Darussalam;2. Department of Industrial Engineering, King Abdulaziz University, Abdullah Suleyman Road, Jeddah, 21589, Saudi Arabia
Abstract:This paper proposes a new integration method for cell formation, group scheduling, production, and preventive maintenance (PM) planning problems in a dynamic cellular manufacturing system (CMS). The cell formation sub-problem aims to form part families and machine groups, which minimizes the inter-cell material handling, under-utilization, and relocation costs. The production planning aspect is a multi-item capacitated lot-sizing problem accompanied by sub-contracting decisions, while the group scheduling problem deals with the decisions on the sequential order of the parts and their corresponding completion times. The purpose of the maintenance sub-problem is to determine the availability of the system and the time when the noncyclical perfect PM must be implemented to reduce the number of corrective actions. Numerical examples are generated and solved by Bender’s decomposition pack in GAMS to evaluate the interactions of the proposed model. Statistical analysis, based on a nonparametric method, is also used to study the behavior of the model’s cost components in two different situations. It is shown that by adding the PM planning decisions to the tactical decisions of the dynamic CMS, the optimal configuration and production plans of the system are heavily affected. The results indicate that omitting the PM actions increases the number of sudden failures, which leads to a higher total cost. Finally, it is concluded that the boost in the total availability of the dynamic CMS is one of the main advantages of the proposed integrated method.
Keywords:Cellular manufacturing system  Group scheduling  Production planning  Preventive maintenance  Availability
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号