首页 | 本学科首页   官方微博 | 高级检索  
     

计及可靠性约束的配电网故障指示器优化布点方法
引用本文:何乐彰,何炳源,徐俊杰,谢义苗,栗子豪.计及可靠性约束的配电网故障指示器优化布点方法[J].电力系统自动化,2020,44(18):116-123.
作者姓名:何乐彰  何炳源  徐俊杰  谢义苗  栗子豪
作者单位:1.国网江西省电力有限公司上饶供电分公司,江西省上饶市 334000;2.清华大学电机工程与应用电子技术系,北京市 100084;3.电力系统及发电设备控制和仿真国家重点实验室,清华大学,北京市 100084
摘    要:近年来,故障指示器凭借其接入灵活性和经济性被广泛应用于配电网故障定位中。然而全覆盖式地故障指示器安装配置方案投资成本高,规划方案不精益。文中提出一种基于故障信息变量的配电网可靠性评估模型;进一步给出一种基于混合整数线性规划的可靠性约束的配电网故障指示器优化布点方法,将可靠性指标作为约束放入优化模型中,在满足可靠性要求的前提下降低故障指示器的投资维护成本。基于IEEE 53节点系统的算例仿真结果表明,所提方法兼顾了故障指示器布点的可靠性与经济性,可以精确获得不同可靠性要求下的布点方案。

关 键 词:配电网  可靠性  故障定位  故障指示器  混合整数线性规划
收稿时间:2020/2/20 0:00:00
修稿时间:2020/5/13 0:00:00

Optimal Placement Method of Fault Indicator in Distribution Network Considering Reliability Constraints
HE Lezhang,HE Bingyuan,XU Junjie,XIE Yimiao,LI Zihao.Optimal Placement Method of Fault Indicator in Distribution Network Considering Reliability Constraints[J].Automation of Electric Power Systems,2020,44(18):116-123.
Authors:HE Lezhang  HE Bingyuan  XU Junjie  XIE Yimiao  LI Zihao
Affiliation:1.Shangrao Power Supply Branch of State Grid Jiangxi Electric Power Company Limited, Shangrao 334000, China;2.Department of Electrical Engineering, Tsinghua University, Beijing 100084, China;3.State Key Laboratory of Control and Simulation of Power System and Generation Equipments,Tsinghua University, Beijing 100084, China
Abstract:In recent years, fault indicator is widely used for fault location of distribution network because of its access flexibility and economy. However, the full-coverage installation configuration scheme of fault indicators has high investment cost, and the planning scheme is not lean. In this paper, a distribution network reliability assessment model based on fault information variables is proposed, and an optimal placement method of fault indicators in distribution network based on reliability constraints and mixed-integer linear programming is proposed. The reliability indices are put into the optimization model as a constraint to reduce the investment and maintenance cost of fault indicators on the premise of meeting the reliability requirements. The simulation based on IEEE 53-bus system shows that the reliability and economy of fault indicator placement are taken into account in the proposed method, and the placement schemes under different reliability requirements can be accurately obtained.
Keywords:distribution network  reliability  fault location  fault indicator  mixed-integer linear programming
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号