首页 | 本学科首页   官方微博 | 高级检索  
     

不同混凝土浇筑成型方式下高耸进水塔结构动力特性
引用本文:杨光,李守义,李浪,杨勇.不同混凝土浇筑成型方式下高耸进水塔结构动力特性[J].水电能源科学,2020,38(6):92-95.
作者姓名:杨光  李守义  李浪  杨勇
作者单位:西安理工大学水利水电学院,陕西西安710048;西安理工大学水利水电学院,陕西西安710048;西安理工大学水利水电学院,陕西西安710048;西安理工大学水利水电学院,陕西西安710048
基金项目:国家自然科学基金项目(51579208);陕西省教育厅专项科研计划(19JK0583)
摘    要:为探究不同混凝土浇筑成型方式对进水塔的影响,使用时程分析法计算了地震作用下进水塔结构在不同浇筑成型方式下的动力响应,分析了塔体的动力特性,研究了浇筑成型方式对进水塔结构应力、位移的影响。结果表明,整体浇筑时进水塔横梁、拦污栅墩、纵梁处的第一主应力较分开浇筑时有较大改善;塔体与塔背回填混凝土整体浇筑时进水塔顺河向、竖向、横河向的位移最大值较分开浇筑时有一定幅度的减小;采用塔体与塔背回填混凝土整体浇筑的浇筑成型方式,能有效降低进水塔结构的位移与应力,对其抗震性能的改善具有重要作用。

关 键 词:高耸进水塔  混凝土浇筑成型方式  时程分析  位移  应力

Dynamic Characteristics of Tall Water Intake Tower under Different Concrete Pouring and Forming Modes
YANG Guang,LI Shou-yi,LI Lang,YANG Yong.Dynamic Characteristics of Tall Water Intake Tower under Different Concrete Pouring and Forming Modes[J].International Journal Hydroelectric Energy,2020,38(6):92-95.
Authors:YANG Guang  LI Shou-yi  LI Lang  YANG Yong
Affiliation:(College of Water Conservancy and Hydropower,Xi’an University of Technology,Xi’an 710048,China)
Abstract:In order to investigate the influence of different concrete pouring and forming modes on water intake tower, the time history analysis method is used to calculate the dynamic response of the intake tower structure under earthquake under different concrete pouring and forming modes. The dynamic characteristics of the tower body are analyzed. In addition, the influence of different concrete pouring and forming modes on the stress, displacement of the intake tower structure is also studied. The results show that the first principal stress at the cross beam, trash rack pier and longitudinal beam of the intake tower is greatly improved during the integral casting compared with that during the separate casting. The maximum displacement of the intake tower along the river, vertically and horizontally when the back of the tower is backfilled with concrete and the whole tower body is poured is reduced to a certain extent compared with that when pouring separately. The construction scheme of backfilling concrete at the back of the tower and integral pouring of the tower body can effectively reduce the displacement and stress of the intake tower structure, and play an important role in improving its anti seismic performance.
Keywords:high rise intake tower  concrete pouring and forming modes  time history analysis  displacement  stress
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《水电能源科学》浏览原始摘要信息
点击此处可从《水电能源科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号