考虑弃水电量机会损失的水火电短期联合优化调度 |
| |
引用本文: | 陈颖毅,王丽萍,赵亚威,张验科,吕盼成,苏阳悦. 考虑弃水电量机会损失的水火电短期联合优化调度[J]. 水电能源科学, 2020, 38(7): 65-68 |
| |
作者姓名: | 陈颖毅 王丽萍 赵亚威 张验科 吕盼成 苏阳悦 |
| |
作者单位: | 华北电力大学水利与水电工程学院,北京102206;惠州市水文局,广东惠州516001 |
| |
基金项目: | 国家自然科学基金项目(51709105);中央高校基本科研业务费专项资金资助项目(2019MS031);国家重点研发计划(2016YFC0402208) |
| |
摘 要: | 针对传统大型水火电系统联合优化模型成本计算单一问题,考虑水电因弃水导致的机会损失,并考虑水火电爬坡约束、水电振动区约束等多种复杂约束,构建以火电运行成本与水电弃水电量机会损失之和最小为目标的水火电短期优化调度模型。将模型中非线性约束转化为线性化约束,并使用商业优化软件CPLEX中内置的分支定界法进行求解。算例仿真表明,按此优化准则下的最优策略运行,虽然火电运行成本有所增加,但弃水电量大大减小,水电能源利用率明显提升,计算结果更加符合实际情况。
|
关 键 词: | 水火电力系统 短期联合优化调度 水火电爬坡约束 弃水电量机会损失 |
Short-term Coordination Optimal of Hydrothermal Scheduling Considering Opportunity Loss of Surplus Hydropower |
| |
Abstract: | This paper deals with the single problem of cost calculation of the traditional joint optimization model of large hydrothermal power systems. The model takes into account the opportunity loss of hydropower due to spill water, as well as the multiple complex constraints such as hydrothermal ramp constraint and hydropower vibration zone constraint. The short - term optimal scheduling model of hydrothermal power system was established with the minimum sum of operation cost of thermal power and opportunity loss of surplus hydropower. The nonlinear constraints in the model were transformed into linearization constraints and solved by using the branch and bound built in the commercial optimization software CPLEX. The example simulation results show that according to the optimal operation strategy under this optimization criterion, although the operating cost of thermal power increases, the amount of surplus hydropower is greatly reduced, the energy efficiency of hydropower is obviously improved, and the results are more consistent with the actual situation. |
| |
Keywords: | hydrothermal power system short-term coordination optimal scheduling hydrothermal ramp constraint opportunity loss of surplus hydropower |
本文献已被 CNKI 万方数据 等数据库收录! |
| 点击此处可从《水电能源科学》浏览原始摘要信息 |
|
点击此处可从《水电能源科学》下载全文 |
|