峨口铁矿1932排土场稳定性对泥石流形成的影响
引用本文:张兴,边澍. 峨口铁矿1932排土场稳定性对泥石流形成的影响[J]. 矿冶工程, 1987, 7(4): 15-19
作者姓名:张兴  边澍
作者单位:北京钢铁学院
摘    要:本文针对山西峨口铁矿1932排土场稳定性问题讨论了排土场稳定性对泥石流形成的影响,通过现场调查、观测并结合室内模型实验及理论计算,作者认为:岩土混排,土场基底充分饱水和暴雨泾流是该土场可能形成泥石流的根本原因。

关 键 词:排土场稳定性分析  泥石流  露天开采  

THE EFFECT OF STABILITY ON FORMATION OF DEBRIS FLOW IN THE REFUSE DUMP AT 1932 LEVEL IN O-KOU IRON OPEN PIT MINE
Zhang Xing Bian Shu. THE EFFECT OF STABILITY ON FORMATION OF DEBRIS FLOW IN THE REFUSE DUMP AT 1932 LEVEL IN O-KOU IRON OPEN PIT MINE[J]. Mining and Metallurgical Engineering, 1987, 7(4): 15-19
Authors:Zhang Xing Bian Shu
Affiliation:Beijing University of Iron and Steel Technology
Abstract:This paper discusses the formation mechanism of sliding-debrisflow in the refuse dump at 1932 level in the O-Kou Open Pit Mine, Shanxi Province.Based on the field survey, simulation tests and theoretical calculation, the following points can be drawn.1. If rock materials alone are discharged into the dump, it is almost impossible for sliding-debris-flow to occur even the dump slides after rainfall.2. If rock and soil materials are discharged mixedly, it is likely for the water-debris-flow to happen after rainstorm even the dump does not slide.This type of water-debris-flow has only a slight damage to the tailings dam below the dump.3. If rock and soil materials are discharged mixedly, it is likely for the sliding-debris-flow to occur after rainstorm under the conditions that the dump and its base are saturated, and for the slip occurs. This type of sliding-debris-flow has a bad damage to the tailings dam below the dump.
Keywords:Stability analysis   Refuse dump sliding-debris-flow   Surface mining