首页 | 本学科首页   官方微博 | 高级检索  
     

唐家山堰塞湖大水沟泥石流发育特征及堵江危害性评价
引用本文:胡卸文,吕小平,黄润秋,施裕兵,刘娟,李仰波. 唐家山堰塞湖大水沟泥石流发育特征及堵江危害性评价[J]. 岩石力学与工程学报, 2009, 28(4): 850-850
作者姓名:胡卸文  吕小平  黄润秋  施裕兵  刘娟  李仰波
作者单位:1. 西南交通大学,土木工程学院,四川,成都,610031;成都理工大学,地质灾害防治与地质灾害保护国家重点实验室,四川,成都,610059
2. 西南交通大学,土木工程学院,四川,成都,610031
3. 成都理工大学,地质灾害防治与地质灾害保护国家重点实验室,四川,成都,610059
4. 中国水电顾问集团,成都勘测设计研究院,四川,成都,610072
基金项目:国家自然科学基金,地质灾害防治与地质灾害保护国家重点实验室科技减灾、重建家园开放基金,西南交通大学科学研究项目 
摘    要: 大水沟位于唐家山上游侧,“5.12”地震前为一条小山洪冲沟,震后由于沟域内崩塌、滑坡发育,形成极为丰富的松散物源,具备发生泥石流的所有条件,也成为唐家山堰塞湖成功泄水处理后,仍对堰塞湖正常利用起控制作用的严重地质灾害隐患点之一。通过现场实地调查,在查明沟域内松散物源分布及稳定性基础上,结合6.14泥石流发育状况,系统对大水沟泥石流发育特征及其动力学特性,尤其对在不同降雨频率下可能形成的泥石流规模进行分析研究,并对唐家山堰塞湖泄水口部位堵江规模、持续时间、溃决方式及其可能带来的危害性进行评价。分析计算结果已被2008年9月24日发生的百年一遇的泥石流所证实。

关 键 词:工程地质唐家山堰塞湖大水沟泥石流堵江
收稿时间:2008-10-27
修稿时间:2008-12-19

DEVELOPMENTAL FEATURES AND EVALUATION OF BLOCKING DANGERS OF DASHUI DITCH DEBRIS FLOW IN TANGJIASHAN DAMMED LAKE
HU Xiewen,LU Xiaoping,HUANG Runqiu,SHI Yubing,LIU Juan,LI Yangbo. DEVELOPMENTAL FEATURES AND EVALUATION OF BLOCKING DANGERS OF DASHUI DITCH DEBRIS FLOW IN TANGJIASHAN DAMMED LAKE[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(4): 850-850
Authors:HU Xiewen  LU Xiaoping  HUANG Runqiu  SHI Yubing  LIU Juan  LI Yangbo
Abstract:Dashui Ditch is located in the upstream side of Tangjiashan Mountain. It was a gully before the May 12 earthquake,however,extremely rich loose sources were formed with all conditions of the occurrence of a debris flow due to the collapses and landslides after the earthquake. It became one of the serious potential dangers of geological disasters after successful discharge of Tangjiashan dammed lake,which controlled the normal operation of Tangjiashan dammed lake as well. Through in-situ investigation,the developmental and dynamic features of Dashui Ditch debris flow was analyzed systematically combining with the developmental situation of debris flow on June 14 on the basis of identifying the distribution and stability of the groove loose sources. In particular,the possible sizes of the debris flow under different rain frequencies were studied,and the possible blocking size,duration and outburst forms were evaluated. The results were confirmed by the once in 100-year debris flow on September 24,2008.
Keywords:engineering geology  Tangjiashan dammed lake  Dashui Ditch  debris flow  blocking river
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号