丹江口枢纽初期工程设计变更及其效果纪实
引用本文:程国梁,杨小云. 丹江口枢纽初期工程设计变更及其效果纪实[J]. 湖北水力发电, 2008, 0(5)
作者姓名:程国梁  杨小云
作者单位:汉江集团离退休管理处,湖北,丹江口,442700;汉江集团离退休管理处,湖北,丹江口,442700
摘    要:丹江口水利枢纽工程系分两期建设,初期工程于1958年9月1日开工,1973年底建成,在施工及运用期间,枢纽工程设计曾有过多处变更,有些部分甚至是重大的变更,因此,使工程更加安全和完善。

关 键 词:丹江口初期工程  设计变更  效果纪实

Real records about plan modification of Danjiangkou first-phase project and practice results
CHENG Guoliang,YANG Xiaoyun. Real records about plan modification of Danjiangkou first-phase project and practice results[J]. Hubei Water Power, 2008, 0(5)
Authors:CHENG Guoliang  YANG Xiaoyun
Affiliation:CHENG Guoliang,YANG Xiaoyun (Retired Personnel Administrative Office,Hanjiang Group Corp.,Danjiangkou 442700,China)
Abstract:Danjiangkou Hydraulic Project is constructed by two phases, the first-phase project began on Sept.1,1958 and completed in Dec.,1973.A part of the design scheme had been modified,even majorly modified in the construction and operation course; and the safe and perfect results are obtained.
Keywords:first-phase project of Danjiangkou Hydraulic Project  plan modification  real records of results  