变电站深厚淤泥地基的应用研究
引用本文:张端华. 变电站深厚淤泥地基的应用研究[J]. 广东输电与变电技术, 2006, 0(1): 8-14
作者姓名:张端华
作者单位:广东省电力设计研究院
摘    要:本文通过对深厚淤泥地区的地质情况分析,结合变电站建设的实际情况,指出变电站的不均匀沉降等地基破坏现象的成因,列举解决这一问题的多种方法。并根据分析研究比较,提出最佳的综合处理解决方案。该方案经过500kV香山变电站的实践,取得了成功,达到预期的效果,取得了良好的社会效益和经济效益,为解决这一问题提供了有效的手段。

关 键 词:变电站  深厚淤泥  地基处理

Study on how to Treat with Deep/Mass Silt Foundation in Substation
Zhang Duanhua. Study on how to Treat with Deep/Mass Silt Foundation in Substation[J]. Guangdong Power Transmission Technology, 2006, 0(1): 8-14
Authors:Zhang Duanhua
Affiliation:Zhang DuanhuaGuangDong Electric Power Design Institute
Abstract:According to the analysis of the geologic conditions in deep/mass silt area and based on the actual case of substation construction,the cause of foundation destroy in substation,such as asymmetry subsidence,is indicated,various methods to solve this problems are listed,and an optimal colligated solution has been presented according with analyzing,studying and comparing in this paper.The solution was carried out successfully in 500kV Xiang Shan Substation and the expectable effect,and social and economic benefits were gained well,so that an effective means to solve this problem has been offered.
Keywords:Substation Deep/mass silt Foundation treatment  