首页 | 本学科首页   官方微博 | 高级检索  
     

7m大采高综采工作面贯通方法实践
引用本文:代贵生,范文胜. 7m大采高综采工作面贯通方法实践[J]. 中国煤炭, 2012, 38(3): 52-54,61
作者姓名:代贵生  范文胜
作者单位:神华神东煤炭集团补连塔矿,内蒙古自治区伊金霍洛旗,017209
摘    要:介绍了神东煤炭集团补连塔矿7m大采高工作面的贯通方法,包括贯通前期准备、采高的控制、割煤方法、挂第一茬网的方法等,经过采取针对性的措施,解决了大采高工作面贯通时的难题。

关 键 词:大采高  综采工作面  工作面贯通

Linking of fully mechanized mining face with great mining height of 7 m
Dai Guisheng , Fan Wensheng. Linking of fully mechanized mining face with great mining height of 7 m[J]. China Coal, 2012, 38(3): 52-54,61
Authors:Dai Guisheng    Fan Wensheng
Affiliation:(Bulianta Coal Mine,Shenhua Shendong Coal Group Corporation Ltd.,Ejin Horo Banner, Inner Mongolia 017209,China)
Abstract:The way was described to link the fully mechanized mining face with great mining height of 7 m in Shenhua Shendong Coal Group,including preparation,mining height control,coal cutting and hanging the first wire mesh,etc..The problem of linking of fully mechanized mining face with great mining height was solved by some targeted measures.
Keywords:great mining height  fully mechanized mining face  linking of mining face
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号