首页 | 本学科首页   官方微博 | 高级检索  
     

葫芦双梁主梁与端梁高强度螺栓连接的校核
引用本文:罗秀花. 葫芦双梁主梁与端梁高强度螺栓连接的校核[J]. 起重运输机械, 2002, 0(10): 12-14
作者姓名:罗秀花
作者单位:广州起重运输机械实业公司
摘    要:介绍了葫芦双梁主梁与端梁连接的高强度螺栓的校核过程 ,通过分析高强度螺栓的受力特点 ,建立校核模式 ,总结校核步骤及方法

关 键 词:起重机  主梁与端梁连接  高强度螺栓
修稿时间:2001-09-04

Check calculation of high tensile bolt connection between girders and carriages of double girder overhead traveling crane with electric hoist
LUO Xiu-hua. Check calculation of high tensile bolt connection between girders and carriages of double girder overhead traveling crane with electric hoist[J]. Hoisting and Conveying Machinery, 2002, 0(10): 12-14
Authors:LUO Xiu-hua
Affiliation:LUO Xiu-hua
Abstract:For the high tensile bolt connection between girders and carriages of double girder overhead traveling crane with electric hoist,this paper analyzes the forces exerted on the bolts and gives their strength check procedures.
Keywords:crane  connection between girder and carriage  high tensile bolt  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号