Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability
Authors:I-Tung Yang
Affiliation:Assistant Professor, Dept. of Civil Engineering, Tamkang Univ., 151 Ying-chuan Rd., Tamsui, Taipei County 251, Taiwan. E-mail: ityang@mail.tku.edu.tw.
Abstract:This paper proposes a chance-constrained programming model to incorporate the variability of funding, which is quantified by the coefficient of variation. The proposed model formulates financial feasibility as a stochastic constraint, transforms it into a deterministic equivalent at a prespecified confidence level, and solves the system by means of classical optimization techniques. The time–cost curve generated by the proposed model serves as a foundation for optimizing total project cost. To demonstrate the uniqueness of the proposed model, it is compared to previous approaches through a small building example.
Keywords:Computer aided scheduling  Stochastic models  Optimization  Project management  Risk management  Uncertainty principles  Time factors  Costs  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号