首页 | 本学科首页   官方微博 | 高级检索  
     

渤海稠油油田高含水期低产低效井综合治理技术
引用本文:张俊廷,王公昌,王立垒,邓景夫,陈存良,张国浩. 渤海稠油油田高含水期低产低效井综合治理技术[J]. 石油钻采工艺, 2021, 43(5): 687-692. DOI: 10.13639/j.odpt.2021.05.020
作者姓名:张俊廷  王公昌  王立垒  邓景夫  陈存良  张国浩
作者单位:中海石油(中国)有限公司天津分公司渤海石油研究院
基金项目:国家科技重大专项“渤海油田加密调整及提高采收率油藏工程技术示范”(编号:2016ZX05058001)
摘    要:S油田是渤海典型的水驱开发稠油油田,目前油田已经进入高采出程度、高含水率的"双高"阶段,随着油田含水上升,油田低产低效井逐年增多,严重影响油田开发效果.针对S油田地质特征和开发特征,对低产低效井成因进行分析,从剩余油、砂体发育、储层非均质性、注采关系、钻完井污染及井筒完整性等方面开展研究,并对低产低效井进行分类,针对不...

关 键 词:高含水期  低产低效井  剩余油挖潜  治理对策  提高采收率  渤海稠油油田

Comprehensive treatment technologies for the stripped and deficient wells of Bohai heavy oil field in high water cut stage
Affiliation:Bohai Petroleum Research Institute, CNOOC China Limited Tianjin Company, Tianjin 300459, China
Abstract:S Oilfield is a typical waterflooding heavy oil field in Bohai Sea, and by now, it has stepped into the two-high stage (high degree of reserve recovery and high water cut). With the rise of water cut, the number of stripped and deficient wells increases year after year, which seriously impacts the development effect of S Oilfield. Based on the geological and development characteristics of S Oilfield, this paper analyzed the causes of stripped and deficient wells from the aspects of remaining oil, sandbody development, reservoir heterogeneity, injection-production relationship, drilling & completion contamination and wellbore integrity. In addition, the stripped and deficient wells were classified. And based on the classification, the corresponding treatment countermeasures were studied, and the treatment strategies of “areal zoning, vertical layering, classification based research, and simultaneous treatment and potential tapping adjustment” were developed, so as to give full play to the oilfield potential and improve the economic benefit to the utmost. Based on the research and application of stripped and deficient well treatment technologies in S Oilfield in the last three years, a series of technologies have been developed, including high water cut sandbody potential tapping, thin bed potential tapping, high-water-cut horizontal well productivity evaluation, injection/production well pattern adjustment and control, and potential reserve evaluation, which have successfully guided the treatment of 51 stripped and deficient wells in S Oilfield, achieving new proved reserves of 300×104 m3. 33 stripped and deficient wells were treated during 2017-2019, and the daily oil increment was 1 200 m3 in July 2019. It is predicted that the cumulative oil increment by the end of development stage will be nearly 240×104 m3 and the recovery factor will be increased by about 1%, indicating remarkable treatment results of stripped and deficient wells. The research and application of these comprehensive stripped and deficient treatment technologies is of certain guidance and reference significance to the treatment of stripped and deficient wells of offshore heavy oil fields in high water cut stage.
Keywords:
点击此处可从《石油钻采工艺》浏览原始摘要信息
点击此处可从《石油钻采工艺》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号