景洪水电站成品骨料罐结构设计与滑模施工
引用本文:黄登成,吴姿. 景洪水电站成品骨料罐结构设计与滑模施工[J]. 水利水电科技进展, 2005, 25(6): 52-55
作者姓名:黄登成  吴姿
作者单位:中国水利水电第三工程局,云南,景洪,666100;中国水利水电第三工程局,云南,景洪,666100
摘    要:介绍景洪水电站右岸混凝土拌和及制冷系统成品骨料罐的选型、罐壁结构设计以及滑模选型方法和滑模混凝土施工质量控制方法.罐壁采用钢筋混凝土圆形结构,采用桁架式滑模施工,通过施工及运行证明,骨料罐结构经济合理;采用滑模浇筑混凝土,大大加快了工程进度,并确保了混凝土施工质量.

关 键 词:混凝土拌和系统  骨料罐  结构设计  滑模施工  景洪水电站
文章编号:1006-7647(2005)06-0052-04
修稿时间:2004-09-01

Structure design and slip form construction for finished aggregate tins at Jinghong Hydropower Station
HUANG Deng-cheng,WU Zi. Structure design and slip form construction for finished aggregate tins at Jinghong Hydropower Station[J]. Advances in Science and Technology of Water Resources, 2005, 25(6): 52-55
Authors:HUANG Deng-cheng  WU Zi
Abstract:An introduction was given to the type selection of finished aggregate tins for concrete mixing and cooling system at the right bank of the Jinghong Hydropower Station and the methods for tin wall structure design,type selection for slip form,and construction quality control.A rounded reinforced concrete structure was adopted in tin wall design,and the truss-type slip form was adopted in the construction.The construction and operation of the project show that the aggregate tin structure is economical,and that the adoption of slip form in concrete placement greatly shortens the working schedule of the project,and ensures the quality of concrete construction.
Keywords:concrete mixing system  aggregate tin  structure design  slip form construction  Jinghong Hydropower Station