根据露天矿长期计划自动形成短期计划 的0-1整数规划方法
引用本文:孙效玉,张维国,陈毓,王侠,孙梦红. 根据露天矿长期计划自动形成短期计划 的0-1整数规划方法[J]. 煤炭学报, 2012, 37(7): 1139-1143
作者姓名:孙效玉  张维国  陈毓  王侠  孙梦红
作者单位:东北大学 资源与土木工程学院,辽宁 沈阳110819
基金项目:“十一五”国家科技支撑计划资助项目(2006BAB16B06)
摘    要:针对露天矿生产不均衡产生的长期计划与短期计划严重脱节问题,通过对露天矿时空发展关系的分析,分时段建立露天矿短期计划的0-1整数规划模型,提出了超级组合块的概念,论述了短期计划优化处理逻辑。并在Surpac平台上采用TCL语言二次开发完成长期计划制作、台阶条块划分与动态显示功能,在VC++环境下通过调用LindoAPI数学软件自动优化形成短期计划。结果只需十几分钟到几小时的时间,即可实现传统方法根本无力解决的根据长期计划自动形成短期计划、进而验证长期计划的难题,实践证明这种方法稳定性强、工作效率高。

关 键 词:露天矿;生产计划;0-1整数规划;超级组合块;Surpac;LindoAPI  
收稿时间:2011-08-18

Automatic formation of short-term plan based on the long-term plan on open-pit mine using 0-1 integer programming
SUN Xiao-yu,ZHANG Wei-guo,CHEN Yu,WANG Xia,SUN Meng-hong. Automatic formation of short-term plan based on the long-term plan on open-pit mine using 0-1 integer programming[J]. Journal of China Coal Society, 2012, 37(7): 1139-1143
Authors:SUN Xiao-yu  ZHANG Wei-guo  CHEN Yu  WANG Xia  SUN Meng-hong
Affiliation:1.School of Resources & Civil Engineering,Northeastern University,Shenyang 110819,China;2.Shenyang Research Institute,China Coal Technology & Engineering Group,Shenyang 113122,China;3.Faculty of Mathematics,University of Waterloo,Waterloo N2L3G1,Canada)
Abstract:To solve the confliction between long-term and short-term production plan on open-pit mine,established a 0-1 integer programming model of short-term plans by time period applying with space-time development,and a new concept of "super combo blocks" was proposed and the progress logic of short-term plan was dealt with.It implemented the design of long-term plan,dividing blocks from strip benches and dynamic displaying by secondary development using the TCL language on the Surpac software platform.The short-term plan could be automatically optimized by calling LindoAPI mathematical software under Visual C++ environment.It solved the problem that the short-term plan cannot be drawn out from automatic optimization based on long-term plan,but the program running time could be minutes or few hours.The reliability and efficiency of the method is proved in the work field.
Keywords:open-pit  production planning  0-1 integer programming  super combo blocks  Surpac  LindoAPI