首页 | 本学科首页   官方微博 | 高级检索  
     

半解析方法用于房柱式开采沉陷的三维计算
引用本文:刘立民,刘汉龙,连传杰,朱珍德,卫建清. 半解析方法用于房柱式开采沉陷的三维计算[J]. 煤炭学报, 2002, 27(5): 462-467
作者姓名:刘立民  刘汉龙  连传杰  朱珍德  卫建清
作者单位:1. 河海大学,岩土工程研究所,江苏,南京,210098;山东科技大学,特殊开采研究所,山东,泰安,271019
2. 河海大学,岩土工程研究所,江苏,南京,210098
3. 兖州矿业集团,南屯煤矿,山东,邹城,273500
摘    要:半解析数值方法具有降低维数、节省内存、建模工作量小等特点,用于三维开采沉陷计算和应力分析具有明显的优越性。基于半解析方法中的层单元和棱柱单元推导计算方法,在Visual Fortran 6.5环境下编写了可用于全采、条采和房柱式开采的三维沉陷计算和应力分析程序。以兖州矿业集团南屯煤矿房柱式开采的地质采矿条件为基础,应用三维半解析数值方法,分别对房柱式和条带式开采条件下的地表沉陷进行了三维对比模拟计算,获得了房柱式和条带式开采的控制地表沉陷的对比结果。

关 键 词:半解析法 房柱式 开采沉陷 应力分析 地质采矿条件
文章编号:0253-9993(2002)05-0462-06
修稿时间:2001-12-01

A semi-analytic method used in three-dimensional subsidence calculation of room and pillar mining
LIU Li min ,,LIU Han long ,LIAN Chuan jie ,,ZHU Zhen de ,WEI Jian Qing. A semi-analytic method used in three-dimensional subsidence calculation of room and pillar mining[J]. Journal of China Coal Society, 2002, 27(5): 462-467
Authors:LIU Li min     LIU Han long   LIAN Chuan jie     ZHU Zhen de   WEI Jian Qing
Affiliation:LIU Li min 1,2,LIU Han long 1,LIAN Chuan jie 1,2,ZHU Zhen de 1,WEI Jian Qing 3
Abstract:In this paper, the semi analytic numerical method has been used to calculate the ground subsidence and strata stress caused by mining. By means of the layer unit and the columnar unit as well as partially introducing the analytic solution and the analytic function in accordance with the geological characteristics of each underground stratum, the three dimensional analysis has been simplified. At the same time, the three dimensional semi analytic numerical analysis program has been worked out with the software platform of Visual Fortran 6 5. It is applicable to all mining geological conditions and mining methods. Based on the condition of room and pillar mining practice of Nantun Colliery, the three dimensional surface subsidence and overburden stress analysis have been studied at the condition of room and pillar and strip type exploitation by using the semi analytic numerical calculation method. Contrast result of surface subsidence caused by these two mining methods is obtained.
Keywords:semi analytic method  layer unit  room and pillar mining methods  mining subsidence  stress analysis
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号