摘    要:对大型地下洞室群三维地质力学模型试验中施工过程模拟的隐蔽开挖问题进行了研究探讨,确定了隐蔽开挖的基本原则,研究设计了隐蔽开挖中的定位系统、开挖系统和内窥系统,介绍了试验中隐蔽开挖的实施过程。通过这一系统的应用,实现了真正意义上的地下洞室群的施工过程试验模拟。

关 键 词:地下洞室群 模型试验 开挖 三维地质力学模型 定位系统
文章编号:1000-6915(2004)02-0181-06
收稿时间:2002-03-01
修稿时间:2002-04-08

DESIGN AND RESEARCH ON CONCEALED EXCAVATION SYSTEM FOR 3D GEO-MECHANICAL MODEL TEST OF LARGE UNDERGROUND HOUSES
Li Zhongkui,Lu Darong,Hong Liang,Liu Jun. DESIGN AND RESEARCH ON CONCEALED EXCAVATION SYSTEM FOR 3D GEO-MECHANICAL MODEL TEST OF LARGE UNDERGROUND HOUSES[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(2): 181-186
Authors:Li Zhongkui  Lu Darong  Hong Liang  Liu Jun
Affiliation:Li Zhongkui1,Lu Darong2,Hong Liang2,Liu Jun1
Abstract:The model tests for underground houses,in the past,were mostly two dimensional or three dimensional in small size. In those model tests,the excavation process was not simulated in its real meaning,or even a ready-made tunnel or a cavern was simply put into the model before loading,which is unreasonable because the tunnel should be excavated under the condition of initial stress field. Many researchers improved the situation by loading the model prior the excavation simulation. However,the excavation was modeled by pulling some rigid blocks or withdrawing inner pressure applied by hydraulic jack from the ready-made tunnel or cavern. But this can only be done for the plane model test,and was surely not the best way to simulate the excavation process. Recent years,more and more large,even huge underground projects with cavern group are under planning,designing and construction in China,as well as in the world. Besides the numerical simulation,physical and geo-mechanical model tests have been putting on the agenda to meet engineering request. The technique of concealed excavation in a three dimensional geo-mechanical model test for an underground powerhouses of a large hydropower station is studied in present paper,including the determination of basic principles of concealed excavation,the design of positioning systems inside and outside of the model,special designed micro-step-forword boring machine and devices,internal monitoring system by using the mini-infrared-camera and introduction to the process of concealed excavation.
Keywords:underground engineering  model testing  concealed excavation simulation  3D geo-mechanical model test  underground houses