首页 | 本学科首页   官方微博 | 高级检索  
     


A septic tank‐UASB combined system for domestic wastewater treatment: a pilot test
Authors:Sunil P. Lohani  Rune Bakke  Sanjay N. Khanal
Affiliation:1. Kathmandu University, Nepal;2. Telemark University College, Norway
Abstract:A 250 L and a 550 L pilot scale Up‐Flow Anaerobic Sludge Blanket (UASB) reactors having different reactor height were fed septic tank effluents and operated at ambient temperatures of 0°C to 30°C. Both UASB reactors were fed intermittently at least 8 times per Hydraulic Retention Time (HRT) and the performance was monitored at 4d and 1d HRT. The removal efficiencies of Total Suspended Solid (TSS) and Total Chemical Oxygen Demand (CODt) were about 59–68% and 54–59%, respectively, for both reactors at both HRT. The TSS and CODt removal efficiencies of Septic tank – UASB combined system were above 80% for both HRTs tested. The average biogas yields were almost same at 4d and 1d HRT, representing 31(±3)% of influent CODt. The nitrogen and phosphorous removal efficiency was an average 20–30%. The tested system can become a suitable low cost yet effective option.
Keywords:domestic wastewater treatment  hydraulic retention time  organic loading rate  septic tank  up‐flow anaerobic sludge blanket
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号