首页 | 本学科首页   官方微博 | 高级检索  
     

平原感潮河网地区控制片主要口门设站的选择分析
作者姓名:程公德
作者单位:上海市青浦区水文勘测队
摘    要:为综合考虑水文站网投资预算、建设条件和管理维护等因素,及时、准确地监测控制片与外河交换的水量,需根据河道水情、现场环境、工作需求等情况合理规划主要口门的设站批次,有计划地完善站网布局。以上海市青浦区为例,梳理区域控制片主要口门设站现状,利用已有数据资料,从区域发展、河道级别、模型需要、水量大小和流量变幅方面分析设站的必要性,以及从水层代表性、断面地形、站址条件、基础建设成本和流速分布方面分析设站的可行性分析,采用目标分解法建立设站指标体系,利用德菲尔法确定各指标权重,再应用线性加权求和法进行综合比选,进而确定主要口门设站的批次。结果得到青浦区控制片主要口门设站3个批次,各批次分别有7,5,和3处,可为南方平原感潮河网地区控制片主要口门设站的选择分析提供新的方法。

关 键 词:平原区  主要口门  设站  选择  必要性  可行性  指标体系  线性加权求和
收稿时间:2022/7/28 0:00:00
修稿时间:2022/9/17 0:00:00

Analysis on the selection of hydrological stations at the main entrance of control area in plain tidal river network region
Authors:CHENG Gongde
Affiliation:Hydrological Survey Team of Shanghai Qingpu District
Abstract:In order to comprehensively consider the investment budget, construction conditions, management and maintenance of the hydrological station network, timely and accurately monitor the water volume exchanged between the control section and the outer river. It is necessary to reasonably plan the station set-up batch of the main entrance according to the river water condition, site environment, work demand, etc., and improve the station network layout in a planned way. Take Qingpu District of Shanghai as an example to sort out the current situation of setting stations at the main entrance of the regional control panel, Based on the existing data, the necessity of station setting is analyzed from the aspects of regional development, river level, model demand, water volume and flow variation amplitude, and the feasibility of station setting is analyzed from the aspects of water layer representativeness, section topography, station site conditions, infrastructure cost and flow velocity distribution. Use the goal decomposition method to establish the index system and use the Delphi method to determine the weight of each index, adopt linear weighted summation method to carry out comprehensive selection, then determine the sequence of building stations at the main entrance. The results show that there are three batches of stations at the main entrance of Qingpu District control panel, and there are 7, 5 and 3 stations in each batch. It can provide a new method for the selection and analysis of stations at the main entrance of the control area in the tidal river network of the plain.
Keywords:plain area  main entrance door  station construction  select  necessity  feasibility  indicator system  linear weighted sum
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号