首页 | 本学科首页   官方微博 | 高级检索  
     

岩滩水电站扩建工程巨型转轮工地制造技术
引用本文:莫国华,粟永基.岩滩水电站扩建工程巨型转轮工地制造技术[J].红水河,2014(2):63-70.
作者姓名:莫国华  粟永基
作者单位:大唐岩滩水力发电有限责任公司
摘    要:受运输条件限制,很多电站大型转轮选择在工地现场制作,而且目前转轮在现场制作的工艺技术越来越成熟,工地制造的转轮质量比较有保障。岩滩水电站扩建工程巨型转轮目前已在工地制造完毕。对岩滩水电站扩建工程巨型转轮制造工作总结,可为其它电站转轮的现场制造提供一定的参考。

关 键 词:岩滩水电站扩建工程  转轮工地制造

On-site Manufacturing Technology of Large Runner for Extension Project of Yantan Hydropower Station
MO Guo-hua;SU Yong-ji.On-site Manufacturing Technology of Large Runner for Extension Project of Yantan Hydropower Station[J].Hongshui River,2014(2):63-70.
Authors:MO Guo-hua;SU Yong-ji
Affiliation:MO Guo-hua;SU Yong-ji;Datang Yantan Hydropower Co., Ltd.;
Abstract:Restricted by traffic conditions, the large-scale runner for many stations are manufactured on site, which greatly advance the site manufacturing technology of runner and improve the quality of the on-site manufactured run- ners. The on-site manufacture of the large-scale runner for the Extension Project of Yantan Hydropower Station has completed, whose experience can be well referenced by other projects.
Keywords:Extension Project of Yantan Hydropower Station  on-site manufacturing of runner
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号